Sign In
Not register? Register Now!
Pages:
4 pages/≈1100 words
Sources:
3 Sources
Style:
MLA
Subject:
Engineering
Type:
Essay
Language:
English (U.S.)
Document:
MS Word
Date:
Total cost:
$ 21.6
Topic:

Warehouse Planning and Development

Essay Instructions:

Pay attention to the citation format, and the details of the literature should be written clearly
-------
Update
Hi!The construction of this 1000 word article is in the document I gave you. (bounded_warehouse.pdf)

Essay Sample Content Preview:

Warehouse Planning and Development
Student’s Name
Instructor’s Name
Institutional Affiliation
Course
Date
Contents Warehouse Planning and Development. 3 1.1 Background to the Site. 3 1.2 The problem... 3 1.3 Infographic. 4 1.4 Warehouse Planning. 5 1.4 Target Market 5 1.4.1 Potential Partners. 5 1.4.2 Finance + Income Generation. 5 1.4.3 Existing Assets Alteration Strategy (sum) 5 1.4.4 Regenerative strategy intent Needed Assets. 5 1.4.5 Desired Outcomes. 5 1.4.6 Benefits to the Community. 5 1.5 Viability and Intention.. 5 References. 7  
Warehouse Planning and Development
1.1 Background to the Site
.
Figure 1. Friargate Goods Yard Site, DE1 1JL: Engine House. Adopted from https://live.staticflickr.com/65535/48128847883_0636960f2e_o.jpg
The engine house, which is similar to a power plant will be built upon commissioning of the Donald Insall Associates. Development of the engine house is for the purpose of ensuring the site is safe for everyone. Also, there will be installation of all the necessary equipment to enhance efficient power production. The following activities are expected to be undertaken to improve the state of the engine house.
* Structural works to improve stability of the external walls and loose items of building fabric.
* Erection of scaffold for footpath protection and to allow access to window and roof level and provide restraint to the building.
* Roof works to include capping beams or reinstatement roofing and remodeling of the external ground levels.
Site Location
The Engine House is located next to Friar Gate Bridge against the pavement edge of Great Northern Road. The wider site is bordered to the North by the railway bridge and arches, to the Southeast by Stafford Street and the Southwest Great Northern Road. The building is listed as grade II despite not being in a conservation area. According to Bhalla (2016), warehouse location and construction depend on the area in which the intended business has a future of thriving and the ability to improve innovations.
Aims and Objectives
The aims and objectives of the project revolve around constant recording based on availability of archival sources. Therefore, the basic objectives in line with this aim include:
* Uniform level standard
* National Planning policy framework
* Derby City local plan
* Areas of special interest
1.2 The problem
The underlying problem is limited supply of power in Derby area. Therefore, the station will be sufficient in supplying hydraulic power once renovated. In this case, it is important to ensure adequate installation of resources required for the renovation of the site and installation of the hydraulic power plant (Hardwick, 2018). According to Grant (2017), inaccessibility of the site has been the significant determiner of the methodology to be undertaken in recording which will be in three phases:
* Phase 1: Historical accounts based on archival research
* Phase 2: Onsite reviews and records during the dismantling process
* Phase 3: Internal recording upon safety development of the building
1.3 Infographic
1.4 Warehouse Planning
1.4 Target Market
The target market for this project is the domesti...
Updated on
Get the Whole Paper!
Not exactly what you need?
Do you need a custom essay? Order right now:

👀 Other Visitors are Viewing These MLA Essay Samples: