Essay Available:
Pages:
5 pages/≈1375 words
Sources:
1 Source
Style:
Harvard
Subject:
Management
Type:
Essay
Language:
English (U.S.)
Document:
MS Word
Date:
Total cost:
$ 21.6
Topic:
Project Management: Work Breakdown Structure and its Scope
Essay Instructions:
https://www(dot)studynet1(dot)herts(dot)ac(dot)uk/ptl/common/learning_resources.nsf/Learning+Resources?ReadForm
Use this link as resources
ask support for login
Please do these 4 topics below and see details in the file
- Work Breakdown Structure (WBS)
- Scope (Summary of the main headings of the WBS)
- Precedence table
- Network diagram including PERT and a Gantt chart where possible for higher marks here
Essay Sample Content Preview:
PROJECT MANAGEMENT
Name:
Institution:
Course Code:
Date:
Work Breakdown Structure (WBS)
WBS is a ‘deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverables. It organizes defines the total scope of the project. Each descending level represents an increasingly detailed definition of the project work’ (Brotherton, Fried, & Norman, 2008). The WBS is used to is used to plan, execute, monitor and control the processes, activities and determine the completed activities, ongoing activities and what is yet to be done. It provides the blueprint to takes large complex projects and break them into smaller, more manageable tasks that can be assigned to specific people or teams to deliver (Mong, 2020). The WBS is used as a starting point for scope management and is integral to other project management processes (Brotherton, Fried, & Norman, 2008). Scope of WBS The scope of the project is the work performed to deliver a product, service, or result with the specified features and functions (Athayde, Elswick, & Lombard, 2013). The WBS for this project does not include the duration for each event or the day to day operations of the project. It solely focuses on the main activities and their sub-activities necessary for the completion of the project. The scope also does not include the resources and or budget needed for the project. That is covered in the resource breakdown structure. The summary of the things covered by the WBS include: Planning – In this phase, the focus will be on coming up with architectural renderings of the whole usable space in the house. Designs will be evaluated and revised before final drawings and rendering is created. The final drawing will be submitted to authorities to obtain permits for construction. Renovation + Retrofitting - Most of the work will be done in this phase. The actual escape room construction (partitioning the space into rooms). The space does not have a bathroom hence it will be constructed in this stage. Faulty plumbing and drainage system will be repaired. Flooring, tiling and painting will all be done in this phase. Fittings and Finishing – The escape rooms are expected to be complete after this phase. There will be electrical wiring and installation of power outlet points. Lighting system installation in the hallways and escape rooms will also be done in this phase. The theme for the project is horror, so lighting will be done in line with the theme. Soundproofing will be done in each escape room. Cabinetry will also be installed in the reception and escape rooms as needed. Horror props and their mechanisms will be installed in this phase. Utilities – CCTV will be installed in the hallways and outside for security. Internet will be installed where necessary especially the reception area. Other systems to be installed in this phase are sound, HVAC, fire, and internet. Sound will be particularly important in the escape rooms for added effect. HVAC will be installed to ensure that there will be good circulation of air in the rooms and ambient temperatures for the games. Fir...
Get the Whole Paper!
Not exactly what you need?
Do you need a custom essay? Order right now:
👀 Other Visitors are Viewing These Harvard Essay Samples:
- Expected Utility and Prospect Theory 2 pages/≈550 words | Harvard | Management | Essay |
- Senior Management Position: Recruitment Strategy At Tesla Company2 pages/≈550 words | 5 Sources | Harvard | Management | Essay |
- Impact of Globalization on Business Operations3 pages/≈825 words | 10 Sources | Harvard | Management | Essay |
- Human resource management Management Essay Research7 pages/≈1925 words | Harvard | Management | Essay |
- Entrepreneurial Economies Management Essay Research9 pages/≈2475 words | Harvard | Management | Essay |
- Current Issues in Management: Norbord Incorporated Sustainability Concepts7 pages/≈1925 words | Harvard | Management | Essay |
- An Investment Analysis Report on Ideko Corporation10 pages/≈2750 words | Harvard | Management | Essay |