Sign In
Not register? Register Now!
Pages:
3 pages/β‰ˆ825 words
Sources:
Check Instructions
Style:
APA
Subject:
Management
Type:
Essay
Language:
English (U.S.)
Document:
MS Word
Date:
Total cost:
$ 12.96
Topic:

Resource Scheduling Methods Analysis Paper

Essay Instructions:

For this assignment, write a paper of 750-1,000 words in which you analyze the concept of resource scheduling and evaluating various methods used to schedule resources in project management.
Your analysis should include the following:
An analysis of the benefits and challenges associated with resource scheduling
A discussion of at least two methods used to schedule resources and examples of when each method would be most appropriate, given the scope of the project
Choose which method would be most appropriate for the project your CLC team selected and explain why you felt it was most appropriate.
You must include at least two additional sources, one of which must be a journal article, outside of your textbook, to support your analysis.
Prepare this assignment according to the APA guidelines found in the APA Style Guide, located in the Student Success Center. An abstract is not required.
This assignment uses a grading rubric. Instructors will be using the rubric to grade the assignment; therefore, students should review the rubric prior to beginning the assignment to become familiar with the assignment criteria and expectations for successful completion of the assignment.

Essay Sample Content Preview:

Resource Scheduling
Student Name
Institution Affiliation
Resource Scheduling
Resource Scheduling is a significant phase in project management. This phase ensures efficient and effective utilization of the available resources. It provides confidence that the project is realistic and helps in the early identification of resource capacity constrictions. It is important to develop techniques that can be used to analyze the resources required to deliver a project successfully. The resources are mostly scarce in supply and so requires extreme techniques for effective and efficient utilization. Therefore, the project development team of project Nickie is tasked with using various methods of resource scheduling to ensure the project objectives are successfully delivered using the available resources .
Concepts of Resource Scheduling
The concepts of resource scheduling involve maintaining a balance between the available resources and the activities to be completed because there is a need to ensure the available resources are sufficient to meet the project demands. Resource scheduling is a collection of techniques used to calculate the resources required to deliver the work and the time they will be require. It involves methods such as resource smoothing, resource leveling, and multi-project scheduling that can be used by the organization to organize and structure their employees so that the projects they need to complete are scheduled, with appropriate start and end dates for each task based on availability of the resources. Resource scheduling can be used to track project estimation and outcomes, and analyze how well the resources are being utilized in a particular project (Brako et al., 2017).
Methods of Resource Scheduling
Resource smoothing. This method considers all dimensions of the project and works within the time frame that has been set by the organization. This can be used to reschedule the activities while maintaining the finish date of the project. This method can be used to schedule any critical activities. It's beneficial in finding the most significant activity that is yet to be scheduled and to adjust the early and late timeframe of unscheduled activities (Gordon & Tulip, 1997). 
Resource Levelling. The method is used in removing peaks and troughs from a schedule produced by a previous procedure. It improves the output of the previous procedures. It ensures that the resource demanded does not exceed the availability by putting a strict limit on the available resources. It is beneficial in identifying the activities scheduled to be in progress at the same time. It helps in moving one of the schedules to reduce the peak and return to the beginning of the cycle. However, resource leveling is one of the most complicated methods to program (Gordon & Tulip, 1997).
Multi-project scheduling. This method is appropriate for more than one project managed by the same w...
Updated on
Get the Whole Paper!
Not exactly what you need?
Do you need a custom essay? Order right now:

πŸ‘€ Other Visitors are Viewing These APA Essay Samples:

HIRE A WRITER FROM $11.95 / PAGE
ORDER WITH 15% DISCOUNT!