Sign In
Not register? Register Now!
Pages:
6 pages/≈1650 words
Sources:
Check Instructions
Style:
APA
Subject:
Management
Type:
Essay
Language:
English (U.S.)
Document:
MS Word
Date:
Total cost:
$ 25.92
Topic:

Project Risk Management Management Essay Research Paper

Essay Instructions:

Overview-Hello, when you start this work please use templet uploaded on the dashboard, you will see 5 cases and each need to contain answers. I don't really know how many pages dose it so whatever you write i will pay for additional pages. When you will use templet be sure answer wit 2 or 3 range.
For this Short Answer Assessment, you will be presented with various scenarios related to a case study. Following each scenario will be several questions or prompts that require a written response.
Access the following to complete this Assessment:
• Pepsi Refresh Project Case Study
• Risk Measurement Scenario
Professional Skills: Written Communication and Critical Thinking and Problem Solving are assessed in this Competency.
This Assessment requires submission of one (1) document: a completed Short Answer Submission Form. Save this file as PM008_firstinitial_lastname (for example, PM008_J_Smith). When you are ready to upload your completed Assessment, use the Assessment tab on the top navigation menu.
Instructions
Before submitting your Assessment, carefully review the rubric. This is the same rubric the assessor will use to evaluate your submission and it provides detailed criteria describing how to achieve or master the Competency. Many students find that understanding the requirements of the Assessment and the rubric criteria help them direct their focus and use their time most productively.
To complete this Assessment:
• Download the Academic Writing Expectations Checklist to use as a guide when completing your Assessment. Responses that do not meet the expectations of scholarly writing will be returned without scoring.
• Download the PM008 Short Answer Submission Form, which includes the Rubric for this Assessment. Complete the form adhering to the criteria presented in the Rubric.

Essay Sample Content Preview:
PM008: Project Risk Measurement
Short Answer Submission Form
Your Name: First and last
Your E-Mail Address: Your email here
Instructions
Write your responses where it reads “Enter your response here.” Write as much as needed to satisfy the requirements indicated. Each item contains the Rubric, which will be used to evaluate your responses.
Short Answer 1
Pepsi’s Board of Directors is considering halting the extension of the Pepsi Refresh Program because the program has not shown a direct link to increased revenue. While the company benefitted from the original program’s social media campaign, the goal of the extension—to establish a link between the program and revenue increases—has not materialized. The continuation of the Pepsi Refresh Program will be conditional on the program’s ability to drive revenue to products in each of the Pepsi product portfolios. This is seen as a significant risk for moving the program forward. Mary Dial, a project manager at Pepsi, and Frank Galdi, a risk management consultant, have been given responsibility for ensuring that the program’s risks are identified and managed effectively. They have determined that a formal process for monitoring and controlling program risks is needed.
* Explain the value of a formal risk monitoring and controlling strategy in the context of the Pepsi Refresh Program extension.
(2–3 paragraphs)
* Describe the process you feel that Mary and Frank should use to monitor and control the risks associated with the “HUGE” campaign to ensure the Pepsi website drives increased revenue.
(3–4 paragraphs)
Your Response
Formal risk monitoring and control strategy determine the process of identifying, analyzing, and planning to mitigate the newly discovered risks in a project (Hazır, 2015). With regards to the Pepsi Refresh Program, it has already been outlined that the program did not benefit Pepsi in boosting its sales. The fundamental cause for this outcome of the program is the indirect association of the program with the product (Tishkov et al., 2017). Therefore, the value of monitor and risk for the project is vital as it will optimize the risk response. Now that Pepsi is aiming to increase revenue by extending the program, so the value of formal risk monitoring and control is essential to identify and treat each risk at the beginning stage. As Pepsi is trying to change the fundamental of the project, a direct association of the product will be called by Pepsi. In response, Pepsi is obliged to monitor and control the misconception of product association.There are different steps involved in risk monitor and control strategy. According to Tishkov et al. (2017), risk managers are free to plan, track, monitor, and control potential risks. Specifically, concerning the present scenario, a five-step monitor and control strategy is suggested as a comprehensive.At first, Mary and Frank should design a risk management plan to draw details about the approach of risk management. The second step is to design a risk register with elements extracted from the risk management plan. A risk register is essential as it indicates an overview of identified risks, its consequences, and treatment st...
Updated on
Get the Whole Paper!
Not exactly what you need?
Do you need a custom essay? Order right now:

👀 Other Visitors are Viewing These APA Essay Samples:

HIRE A WRITER FROM $11.95 / PAGE
ORDER WITH 15% DISCOUNT!